Integrated Report 2024

Adapting our industrial resources to contribute to decarbonisation

Adapting our industrial resources to contribute to decarbonisation 

NaTran is rethinking its model to accelerate the development of renewable gas and adapt its infrastructure to a decentralised energy model. 
In 2024, annual renewable gas production capacity connected to the networks rose to 13.861 TWh/year (vs. 11.790 TWh/year in 2023). Over the course of 2024, 13 injection stations were commissioned and 7 new reverse flow sites were established.